A brief update:
I've been MIA on the pizza forum for good reason....it takes a lot of effort to build and open a restaurant! We are getting close. From tearing out 3 layers of linoleum tile and glue to laying and fixing the concrete substrate, tiling, pouring counters, picking granite, building tables, benches, painting furniture, reclaiming wood to use for picnic table (and trying to straighten that gnarly wood), to having fire marshals fail my unneeded hood system because the sheet metal guy decided to relocate the duct collar a few inches to the left to avoid a beam in the roof....it's taken almost double the time i anticipated...that which doesn't kill us makes us stronger....
I will say, operating a pizzeria has to be easier than building one! I've torn my bicep from lifting too many 80# sacks of concrete, lost approx 40# from working long hours and destroyed most of my wardrobe as all my clothes have become work clothes. But dont play that tiny violin for me....i'm having the time of my life and i havent even baked one pizza in my oven yet!
I'm vowing to serve something to a private gathering of friends next week....hopefully, it will be from the pizza oven, but if not, it will be from the Ole Hickory BBQ that i inherited when i bought the business. I have pretty much everything i need...a gently used berkel bread slicer that i scored for $200 off craigslist and a 12" berkel deli slicer that i scored for $275....yeah, it would be nice to have some shiny new things that didnt require 4 hours of meticulous cleaning, but you know what, in the end, what's the difference?
One of the last things i did was to put toilets in my bathrooms....everyone who ever came to work with me asked if the bathrooms worked....i said no, sorry....knowing full well that i'm about to become a full time janitor, i didnt want cleaning toilets to be part of the buildout process....very smart move.
I have a dedicated dough room with its own HVAC (ok, its a 12ft by 6 ft room with a window unit), nice granite counters, some shelves and i cant wait to clean it up and start mixing dough with my hands (sore, tired hands)....
I'm getting the last few parts i need to finish my kegerator that i built from a chest freezer...it will house 4 craft beers and some white wine kegs....of course the red wine will be served at room temp.
i removed the old 6 burner vulcan range and replaced it with a single blodgett convection oven....still not sure how i will heat water to melt the curd or make a pastry cream for my banana cream pies, but, i'll figure it out. Will probably buy a single burner to help with those tasks and lean on the ovens for roasting instead of sauteing...
walk-in is filled with samples from vendors....
Have 25 doughboxes ready and waiting for balled dough....got the GI Metal perf peel and banjo peel....
I hired a chalk artist who has done a bang up job decorating my walls (all are chalk boards). He's doing our menus too.
I did make a pastrami at Pieous....it was, in a word, unbelievable....
hoping to get open before christmas. Thinking it may be a good time to cut my teeth when things slow down...
Anyways, wishing everyone a happy holiday season filled with PIEOUS'NESS....
Josh